A Fresh Start in Marina Bay: Major Renovation Plans for Marina Agana

best charter yacht in croatia

The Split-Dalmatia County is searching for a new concessionaire for the historic Marina Agana. The published plans point to a major renovation—one that will have far-reaching implications for skippers and residents in Central Dalmatia.

Just about a ten-minute drive west of Trogir’s UNESCO-listed Old Town lies the deeply indented, well-sheltered bay of Marina. For sailors on the Adriatic, the Marina Agana there has been a staple destination for decades—built in the early 1980s, with a family-friendly atmosphere, and valued as a quieter alternative to the major charter hubs in Trogir and Kaštela. Now the marina is facing what is likely the biggest turning point in its history.

On November 3, 2026, the Split-Dalmatia County officially launched the concession process for the construction and commercial operation of the specialized marina for nautical tourism. Unlike many vague announcements along the Adriatic, concrete documentation is already on the table this time: In addition to the tender documents, the site permit, the architectural design, the definition of the port area, and statements from the port authority and the historic preservation office have been published.

What’s planned architecturally: Less bulk, more substance

Anyone who has moored at Marina Agana in recent years is familiar with the two sides of the port: an excellent location and sheltered moorings on the one hand, and a noticeable backlog in investment and, most recently, even uncertainties surrounding the operating permit on the other. To date, the facility has offered 134 water berths for boats up to about 25 meters in length, as well as 70 dry berths, including a 40-metric-ton travel lift.

The project details that emerged in the run-up to the bidding process indicate that the work will go beyond mere cosmetic repairs:

Project AreaCurrent Status / Planned Action
Wave BreakerRemoval of the existing rock-filled breakwater and construction of a new breakwater approximately 140 meters long
ShorelineRenovation, partial expansion, and redesign of approximately 424 meters of shoreline
JettiesRemoval of old docks and construction of three new pontoon docks (one approximately 94 m long, two others approximately 67 m long each)
Berthing capacityPlanned reduction from 134 to 120 berths
Concession termEstimated at 20 years in the previous management plan (2024–2028); the binding term will be determined by the current proceedings

The last point regarding capacity is particularly noteworthy: Instead of cramming even more boats into a very limited space, the plan calls for a slight reduction in the number of berths. This is in line with the current trend in Croatian nautical tourism—moving away from pure volume growth toward more space for modern, wider yachts, better maneuvering areas, and up-to-date infrastructure.

Sailor Croatia App

Between Economic Upturn and Concerns: What Does This Mean for the Town of Marina?

For the small coastal town of Marina, a modernized marina brings tangible economic opportunities. Boaters are considered high-spending guests who can boost business at local restaurants, the daily fruit and fish market, craft shops, and service providers well beyond the peak season.

At the same time, every major project on the Dalmatian coast touches on sensitive everyday issues for the locals:

  • Traffic and Parking: Parking spaces around the port are already in short supply. The connection to the coastal road and the traffic routing through the town will be key factors in determining whether the project is accepted.
  • Municipal Infrastructure: Additional demands on water supply, waste management, and energy must be carefully taken into account.
  • Access to the Sea: For residents, it is crucial to know which parts of the waterfront promenade and the bay will remain freely accessible.

Good to know: A concession is not a sell-off of the coastline

In Croatia, the coastal area, known as “pomorsko dobro” (maritime property), is subject to a special status under public law. A concession explicitly does not mean that land or sea is being sold or that the entire coastline is being closed to the public. It merely grants a time-limited right of use under clearly defined conditions. The specific concession agreement specifies which areas will remain open to the public and which requirements the future operator must meet.

What Happens Next

Despite all the excitement, it’s worth taking a sober look at the timeline: The publication of the request for proposals does not mean that a concessionaire has already been selected, nor that the excavators will be rolling in anytime soon. The final investment amount, the specific financial terms, and the exact obligations that the future operator will assume toward the county and the municipality will be decisive for the evaluation of the overall project.

For skippers, charter guests, and the residents of the marina community, this project will remain one of the most exciting infrastructure initiatives in the Trogir area in the coming months. If transparency, respect for the bay’s established layout, and modern nautical standards come together here, Marina Agana could once again become what it has long been: a relaxed, reliable gem in Central Dalmatia.

Leave a Comment